The Flame chair is made in the UK and is available in a comprehensive range of fabrics. The lead time from order is 3-4 weeks and these chairs arrive assembled and ready for use. This office chair comes with a synchronized mechanism as standard allowing the seat to move in proportion to the back ensuring that the lower and upper pact of the body is always at an angle greater then 90 degrees